Update of quantity
Please note, the order volume has been updated. This is due to package and minimum order quantities.
Please note, the order volume has been updated to. This is due to package and minimum order quantities.
KL 118 is an iconic mixed-development near Jalan Hang Jebat, Kuala Lumpur.
Contractor's are facing a challeges on high shear loading for the tunnel slab connect to tunnel wall. We were asked for the solution to optimized the embedment design in the short period.
We suggested using our Hilti HIT-RE 500 V3 for the tunnel slab connect to tunnel wall. It helps to optimized the embedment design for the heavy shear loading and cost optimization from the design solution.
Our Hilti engineering team also provide the on-site testing service and stayed onsite to help in person throughout the process.
QUICK LINKS
To see account specific prices and content, please choose appropriate account.