Image alt text (optional)

ENSURE CONSTRUCTION INTEGRITY AND COMPLY WITH REGULATIONS

While controlling costs and managing your workforce

Independent studies have identified poor construction procedures as one of the main causes of premature anchor failure, while the American Construction Inspector Association reveal that over-and under-torqued anchors is a major reason for failed jobsite inspections

OVER-TORQUED AND UNDER-TORQUED ANCHORS ARE AMONG THE MOST COMMON CAUSES OF FAILED JOBSITE INSPECTIONS

The consequences to a construction business of improperly installed anchors and failed inspections can be:

  • Installers having to perform corrective rework
  • Project delays
  • Potential fines for late project completion 

All of which add to project costs and hurt your bottom line. 

Anchor pull-out tests can help to mitigate the risk of anchor failure but these take time to organise, add costs and can only identify problems after installation is done.

What if your business could guarantee that every anchor is installed perfectly at the time of installation and provide the documentation to prove it?

OUR FOUR-PART SOLUTION FOR PERFECLY INSTALLED ANCHORS

SIW 6AT-A22, B22, cordless impact wrench, standard battery

SIW 6AT-A22 cordless impact wrench

A cordless impact wrench with intelligent electronics, robust anvil and sleek front for reach in tight places. Cordless tools significantly improve jobsite productivity allowing work to proceed safely and independently of power sources.

SIW 6AT-A22, SI-AT-A22, B22, SI-S

SI-AT-A22 module

A small interface which slots between the impact wrench and its battery and analyses live data from the tool to confirm when an anchor has been installed correctly.

Documentation software

Enables SI-AT A22 module data transfer to a computer and creation of a detailed installation certificate.

Anchor bolts

Our HST3, HSA and HSL4 expansion anchors for cracked and uncracked concrete.

IDENTIFY AREAS OF INEFFICIENCY WITH A PRODUCTIVITY CONSULTATION

INEFFICIENT PROCESSES, UNPLANNED COSTS AND AN UPRODUCTIVE WORKFORCE CAN AMOUNT TO 25% OF TOTAL PROJECT COSTS

Inefficient processes, unplanned costs and an unproductive workforce can amount to up to 25% of the overall cost of a project, imposing a negative impact on your business and its profitability.

With more than 75 years of industry knowledge at Hilti, our consultants have helped hundreds of customers identify opportunities to optimise and streamline their tool park and digitalise the way their tools and other assets are managed, in order to keep hidden costs to a minimum and boost overall productivity.

Please enter Alternative Text here (optional)

INCREASE JOBSITE PRODUCTIVITY

What to know about a Hilti Productivity Consultation

Know more