Skip to main content
Cart

Fire Design of Post-Installed Rebar

Design approaches in accordance with Eurocode and EOTA TR 069 under fire exposure

Post-installed rebars are widely used to connect concrete elements cast at different times, creating monolithic behavior between existing and new members. They offer reliable, fast, and economical solutions for both planned and unforeseen construction needs. Join us to explore the key differences between cast-in and post-installed rebars under fire exposure, and how to design post-installed rebars in accordance with Eurocode requirements, including end anchorages with acting moments as per EOTA TR 069. | Approved BEM CPD : 1 [MySET/EV/CPD/HILTI/2026(114)]


 Sessions

Sorry, no results found.

Presentation material
Fire Design of Post-Installed Rebar
Download