I have a scenario where I have to post drill near at the edge of a RC beam (approximately 150mm away from the edge to the center of bolt) for base plate connection. Therefore, by using PROFIS Engineering, may I know whether it is advisable to analyze the post drilling by considering the RC beam to be in uncracked condition?